Fantastic feedback from K Home

“A short note to thank you and your team for a job well done on the Rotherham Tank Farm Project. Please pass on our thanks to your sales, technical, production and installation teams. We would have no hesitation in recommending Chem Resist for any future projects requiring HDPE tanks.

The Tender Process

“Chem Resist were extremely helpful during the tender process, with your technical expertise in the design and fabrication of HDPE tanks outshining your competitors.

We asked for sloping bases to minimise the heel of inventory remaining in the tanks and you were able to accommodate this.”

The Planning Stage

“You provided tank drawings and data sheets promptly which included the information we required to design our access platforms and develop the piping layout. You altered your manufacturing schedule to suit our installation date and stored the tanks longer than originally anticipated.”

The Installation

Rotherham Tank Farm Install “You arranged a factory visit to Dewsbury to view the tanks being fabricated. You managed the delivery to site and the safe installation, including topping and tailing, then lowering the 4 tanks through the roof and fixing them down.”

Project Completion

“We received your final documentation including tank data books promptly. We have now carried out the site water tests and all tanks have passed.

Please pass on our thanks to your sales, technical, production and installation teams. We would have no hesitation in recommending Chem Resist for any future projects requiring HDPE tanks.

David Amend – Project Manager, K Home International

Back to Blog

X

Get in Touch

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
This field is hidden when viewing the form
X

Request a Quote

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
This field is hidden when viewing the form